Bell to Preston Level Crossing

Wamarra transformed Bell and Preston train stations with stunning landscaping as part of the Level Crossing Removal Project.

For our workforce, this project offered over 14,500 hours of Aboriginal participation and was completed 24 hours ahead of schedule.

Contracted by John Holland, Wamarra’s scope of work included:

  • 11,000m2 of concrete – exposed aggregate and E-Mesh SUP
  • Retaining wall construction, road works, furniture installation with seats, bins and play equipment (Urban Profile)
  • Soil and mulch installation and planting.

Starting with Murray Rd, then Cramer St before finishing with Bell St, the entire open space has been connected by walking and cycling paths. The landscaping included native grasses, flowering varieties and thousands of trees, revitalising the entire area.

The amazing team, alongside John Holland, have created an inviting and eco-friendly space for commuters and the community to enjoy.

Gallery image 1_Bell to Preston
Gallery image 2 edit_Bell to Preston
Gallery image 5_Bell to Preston
Gallery image 4_Bell to Preston
Gallery image 3_Bell to Preston
Gallery image 6_Bell to Preston
Gallery image 7_Bell to Preston

Project Summary

sectorRail
locationPreston, VIC
clientJohn Holland (NWPA)

Expression of Interest

We’re always on the lookout for ambitious, career-minded people to join our team. Submit your details below and introduce yourself! We’ll keep you informed about any upcoming job opportunities at Wamarra.
    • DD slash MM slash YYYY
    • Accepted file types: doc, docx, Max. file size: 2 MB.
      accepted file formats are .doc and .docx
    • Accepted file types: doc, docx, Max. file size: 2 MB.
      accepted file formats are .doc and .docx