Wamarra was engaged to deliver the Dandenong Site Compound Set-up works on behalf of McConnell Dowell as part of the Cranbourne Line Upgrade for Western Program Alliance (WPA).
Project features included the design of the temporary structure, covered walkways (556m2), a covered pre-start area (350m2), concrete paving (906m2) and access stairs and decking.
Wamarra provided design, management, trades and all materials to successfully complete the construction of the compound safely and on schedule.
sector | Roads and Bridges |
location | Dandenong, VIC |
client | McConnell Dowell (WPA) |